View Photos:
11/26/2018
10/01/2018
08/13/2018
06/25/2018
05/28/2018
04/29/2018
04/16/2018
04/02/2018
03/19/2018
03/05/2018
02/19/2018
02/05/2018
01/22/2018
01/08/2018
12/11/2017
11/26/2017
11/13/2017
10/30/2017
10/02/2017
09/18/2017
08/21/2017
07/24/2017
06/12/2017
05/29/2017
04/15/2017
04/03/2017
03/20/2017
03/06/2017
10/31/2016
10/03/2016
09/06/2016
07/11/2016
06/20/2016
05/23/2016
05/02/2016
03/28/2016
03/14/2016
02/15/2016
01/18/2016
12/28/2015
11/23/2015
10/26/2015
09/14/2015
08/17/2015
07/20/2015
07/06/2015
06/22/2015
06/08/2015
05/25/2015
05/11/2015
04/27/2015
04/13/2015
03/16/2015
03/02/2015
02/16/2015
02/02/2015
01/19/2015
01/05/2015
12/08/2014
11/24/2014
11/10/2014
10/27/2014
10/13/2014
09/29/2014
09/15/2014
09/02/2014
08/18/2014
08/04/2014
07/21/2014
07/07/2014
06/23/2014
06/09/2014
06/02/2014
05/27/2014
05/19/2014
05/05/2014
04/28/2014
04/03/2014
03/26/2014
03/04/2014
01/30/2014
|
11/26/2018
Completed Loop Ramp Removal
|
|
I-95 Southbound
|
Mitigation Area
|
|
Sea Street Roundabout
|
10/01/2018
Newly Paved Compost Road Looking North
|
|
Sea Street Under Construction
|
Completed Kimberly Avenue Looking South
08/13/2018
Loop Ramp Demolition
|
|
Loop Ramp Demolition Completed
|
06/25/2018
Ella Grasso Boulevard Alignment
|
|
New Sidewalk Harborside Trail
|
New Sidewalk Kimberly Avenue
05/28/2018
Ella Grasso Boulevard Landscaping
|
|
New Sidewalk & Landscaping Ella Grasso Boulevard
|
Loop Ramp Demolition
04/29/2018
Ella Grasso Boulevard sidewalk installation
|
|
Ella Grasso Boulevard sidewalk installation
|
Project plantings/landscaping
|
|
Project plantings/landscaping
|
04/16/2018
Temporary Work Trestle
|
|
Loop Ramp Demolition
|
Loop Ramp Demolition
04/02/2018
Loop ramp trestle pile installation
|
|
Installing precast barrier, west project limits
|
03/19/2018
Loop ramp demolition
|
|
Installing precast barrier, west project limits
|
03/05/2018
Loop ramp demolition
|
|
Bridge No. 163, Abutment 3, Stage 3 Finger Joint
|
02/19/2018
Drainage Installation on Sea Street
|
|
Loop Ramp Demolition
|
02/05/2018
Remove of Loop Ramp
|
|
Loop Ramp Removal
|
01/22/2018
Remove of West Stage 2 Trestle
|
|
Loop Ramp Removal
|
01/08/2018
Bridge No. 163 Stage 3 Slipform Parapet
|
|
Loop Ramp Removal
|
12/11/2017
Bridge No. 163 Stage 3 Slipform Parapet
|
|
Bridge No. 163 Stage 3 Slipform Parapet
|
11/26/2017
Bridge No. 163 Stage 3 Slipform Parapet
|
|
Bridge No. 163 Stage 3 Slipform Parapet
|
11/13/2017
New Bridge No. 163 Deck
|
|
Reconstructed Median Looking East
|
Bridge No. 164 State 3 Slip Form Parapet
|
|
New Median Barrier and Asphalt Looking East
|
10/30/2017
Bridge No. 163 Deck Pour
|
|
Completed Sections of Bridge No. 163 Deck
|
10/02/2017
Bridge No. 163 Stage 3 Deck Rebar Installation
|
|
Bridge No. 163 Stage 3 Concrete Deck Section
|
09/18/2017
Bridge No. 163 Stage 3 Deck Rebar Installation
|
|
Bridge No. 163 Stage 3 Concrete Deck Section
|
08/21/2017
Stage 3 Construction
|
|
Bridge No. 163 Stage 3 Structural Steel
|
07/24/2017
Stage 3 Structural Steel Launching
06/12/2017
Steel Launching Operation
05/29/2017
Bridge No. 163 Abutment 2
|
|
Footings for Steel Launching
|
Footings for Steel Launching
04/15/2017
Driving Tapertube Piles at Br. 163 Abutment 1
04/03/2017
Pier 2 Grouting TaperTube Piles
03/20/2017
BR163 Abutment 2 Stage 3 Piles Being Grouted
|
|
BR163 Pier 3 Cofferdam
|
BR163 Pier 3 Piles, Footing is Prepped for Reinforcing Steel
03/06/2017
BR163 Abutment 2 Stage 3 Piles Being Grouted
|
|
BR163 Pier 3 Cofferdam
|
BR163 Pier 3 Piles, Footing is Prepped for Reinforcing Steel
10/31/2016
Stage 3 Temporary Work Trestle
|
|
Bridge No. 164 Stage 3 Demolition
|
Bridge No. 164 Pier Demolition
10/03/2016
Strand Jack & Lifting Beam Assembly
|
|
Existing Bridge Section being lifted away from adjacent span
|
SPMT Gantry System Straddling the existing Bridge 163 on newly constructed Bridge 163 I-95 Northbound & Southbound
09/06/2016
Removal of Br. 163 Span 10 Deck
|
|
Removal of Br. 163 Span 10 Steel Girders
|
Self Propelled Modular Transporter to be utilized for the remainder of Br. 163 Superstructure Demolition
07/11/2016
Newly Completed Bridge No. 163 Concrete Deck
|
|
Bridge No. 164 Abutment 2 Prior to Backfill
|
Application of the Membrane Waterproofing on Bridge No. 163
06/20/2016
Bridge No. 163 Slip-Form Parapet
|
|
Bridge No. 163 Slip-Form Parapet
|
New Bridge No. 163 - Stage 2 Concrete Deck & Parapet
05/23/2016
Ella T. Grasso Boulevard paving on the new I-95 SB ramp intersection
|
|
Driving Concrete Piles Bridge No. 164 Stage 2
|
Concrete Deck Pour Bridge No. 163 Stage 2
|
|
Newly Constructed Bridge No. 163 Southbound
|
05/02/2016
Bridge No. 163 Deck Reinforcing
|
|
Bridge No. 163 Looking West
|
Bridge No. 163 Deck Concrete Pour
03/28/2016
Demolition of Existing Bridge Pier
|
|
New Bridge 163 Structural Steel, Looking East
|
03/14/2016
Existing Bridge Pier Demolition
|
|
Existing Bridge Pier Footing Demolition
|
New Bridge No. 162 Stage 2 Structural Steel Erection
|
|
New Bridge No. 163 Stage 2 Looking East
|
02/15/2016
Bridge 163 Abutment 1 Stem Formwork
|
|
Bridge 163 Pier 1 Concrete Piles
|
Bridge 163 Looking East
01/18/2016
Bridge No. 163 – Stage 2 Abutment
|
|
Bridge No. 163 Pier 5 - Stage 2 Cap Formwork
|
Bridge No. 163 - Stage 2 Footing
12/28/2015
Concrete pile driving Bridge 163 Abutment 1 - Stage 2
|
|
Battered Concrete Pile Driving Bridge 163 Abutment 1 - Stage 2
|
Overview of Stage 2 Construction - Looking East at Bridge 163
11/23/2015
Bridge 163 Stage 2, Pier 2 Driven Piles
|
|
Bridge 163 Pier 2 Tremie Concrete Pour
|
10/26/2015
Aerial View of Bridge 163
|
|
Deck Removal of Bridge 163
|
09/14/2015
Existing Bridge No. 163, Asphalt Removal prior to Demolition
|
|
Existing Bridge No. 163 & Stage 2 Temporary Work Trestle
|
Existing Br. No. 163 & Stage 2 Temporary Work Trestle
|
|
“Full Size Render”: Bridge No. 164 Stage 2 Demolition
|
08/17/2015
Paving I-95 Northbound - New Bridge - Over the West River
|
|
Paving I-95 Northbound - New Bridge - Over the West River
|
Paving I-95 Northbound - New Bridge - Over the West River
|
|
Old I-95 Exit 44 Southbound Ramp
|
07/20/2015
Bridge 163 – Bridge deck concrete pour
|
|
Bridge 163 – Membrane Waterproofing installation
|
Bridge 164 – Concrete deck pour
07/06/2015
Bridge 163 – Deck reinforcing
|
|
Bridge 163 – Membrane Waterproofing
|
New Pavement – I-95 NB Exit 44 off ramp
06/22/2015
Bridge 163 – Deck reinforcing
|
|
Bridge 163 – Membrane Waterproofing
|
New Pavement – I-95 NB Exit 44 off ramp
06/08/2015
Bridge 163 underside
|
|
Bridge 163, Stage 1 deck reinforcing
|
Bridge 163 West approach
05/25/2015
Stage 1, Bridge 163
|
|
Closed existing Exit 44 SB off ramp
|
Revised Exit 44 interchange
05/11/2015
Arial view of Bridge # 163, Stage 1 Structural Steel Erection
|
|
Arial view of old Exit 44 Interchange
|
Bridge 163, Stage 1 Structural Steel Erection
04/27/2015
Parapet Slipform Mockup
|
|
Bridge 163 Bridge Deck Before Concrete pour
|
04/13/2015
Formwork and reinforcing steel for Bridge Parapet Mockup
|
|
Saw-cutting existing Bridge sub structure for demolition
|
03/16/2015
Bridge 164, Stage 1B North
|
|
Bridge 164, Stage 1B, NW Abutment 2
|
Structural Steel for new Bridge 163
03/02/2015
Structural Steel Erected to Pier 4 (South of I-95 NB)
|
|
Completed Pier 3, Stage 1 (South of I-95 NB)
|
Arial view of Bridge 163
02/16/2015
Bridge 163 structured steel assembled on the ground
|
|
Bridge 163 structural steel erected at Kimberly Avenue
|
Bridge 164 removal – Stage 1 at Ella Grasso Blvd.
02/02/2015
Bridge 164 Static Load Test
|
|
Bridge 164 Test Pile Installation
|
Ella Grasso Blvd. temporary configuration
01/19/2015
Excavation for new storm water detention basin East of Ella Grasso Blvd.
|
|
New noise barrier wall along of I-95 NB
|
Ella Grasso Blvd. new temporary configuration
01/05/2015
Building of new Pier 5
|
|
|
12/08/2014
New Masonry Noise Barrier Wall under construction. (South of I-95 NB)
|
|
Pier 3 Footing – Reinforcing Steel Installation
|
Pier 2 Footing Concrete Pour
11/24/2014
New I-95 NB on ramp looking West
|
|
New I-95 Northbound on ramp, looking East
|
Newly constructed West Bridge abutment, South of I-95 Northbound
11/10/2014
Pier 3, underwater concrete pour
|
|
Pier 3 piles being cut to grade.
|
Concrete pour, Pier 4 – Stage 1
10/27/2014
Concrete formwork for Abutment 1, Stage 1 (South of I-95 NB)
|
|
Pier 5 concrete pour
|
Pre-fabricated re-bar cage for pier 5, Stage 1 (South of I-95 NB)
10/13/2014
Formwork erection at Abutment 1
|
|
Column rebar cages for Pier 1
|
Reinforcing steel cage for Pier 5 of the West River Bridge
09/29/2014
Yellow formwork erected for new concrete
Pier cap South of I-95 NB
|
|
Camera pole – 100ft traffic camera pole
|
Concrete being placed for Bridge abutment
|
|
Steel reinforcement for 100ft camera pole foundation
|
|
|
|
|
|
|
|
09/15/2014
Permanent drainage outlet
|
|
Abutment No. 1, footing concrete pour
|
Abutment No. 1 footing, South of I-95 NB
|
|
Flex valve backflow preventer installed at tidal outlet
|
09/02/2014
West end area crane activity
|
|
Abutment 1, Br. 163 (Abutment footing)
|
72” back flow preventer
|
|
Junction chamber for tide gate
|
08/18/2014
New pavement installed for Ella T. Grasso Blvd. extension
|
|
New pavement for new Exit 45 NB off ramp
|
Concrete Piles prepped for West River Bridge West approach footing
|
|
Service Cabinet for traffic signals
|
08/04/2014
Electrical contractor preparing for variable message bypass
|
|
Looking West at Pier 3 construction zone
|
Temporary conduit installation for variable message sign
07/21/2014
Bridge parapet removal (South on I-95 NB)
|
|
Precast End Wall
|
Setting Precast End Wall
Temporary Cap for Sanitary Sewer By-Pass
|
|
Geo-synthetic fabric being put down on a layer of soil within a retaining wall.
|
Setting Precast End Wall
07/07/2014
Parapet removal (South of I-95 NB)
|
|
Parapet prepared for removal over Kimberly Ave.
|
Localized paint removal in preparation for steel girder removal.
Temporary retaining wall for East Bridge Abutment.
|
|
Hydraulic pile driving hammer to be used for square concrete piles.
|
Support of excavation for West Abutment (South of I-95 NB)
Localized paint removal in preparation of steel girder demo.
06/23/2014
Temporary lateral earth retaining system for construction of east abutment of new West River Bridge.
|
|
|
|
Placing lightweight fill over 74” pipe sanitary sewer main between preload are 5.1 & 5.2.
Temporary lateral earth support installation at pre load area 5.2
|
|
Backfilling temporary wire wall
|
Formation of subgrade west of Ella T. Grasso Blvd. south of I-95 NB
06/09/2014
Temporary roadway crossing ramp for 12” bypass pipe (Sanitary Sewer)/ Drainage System junction.
|

|
|

|
Trench excavation for 8’ diameter junction chamber.

|
|
8’ diameter junction chamber for roadway drainage.

|
Dewatering a drainage trench.
|
|
|
06/02/2014
Sound attenuated diesel pump for sanitary sewer by-pass.
|
|
Upstream intake for by-pass.
|
05/27/2014
Crew connecting pipes to pumps for temporary sewer bypass.
|
|
24” Diameter penetrations in 74” sewer main for bypass pipes.
|
Crew cutting and welding 18” HDPE pipes for sewer bypass.
05/19/2014
Filling operation at soil pre-load area 5. South of I-95 NB
|
|
Geo Grid installed at soil preload area 5.
|
Tri-Axle dump truck unloading re-use soil for creation of soil preload area.
05/05/2014
South of I-95 NB, soil preload area
|
|
Looking East, new NB I-95 alignment. Temporary work trestle under construction.
|
Filling pre-load area, South of I-95 NB
04/28/2014
Close up of Piles for temp. work trestle
|
|
East temporary work trestle, completion of two spans on the NB side
|
Looking West, 2' Pipe Piles for Temp. work trestle
04/03/2014
West trestle, South of I-95 NB
|
|
East trestle, South of I-95 NB
|
Excavation of material, PLA-2 North of Exit 45 SB Off-ramp
03/26/2014
Wick Drain Installation - Backfill , South of I-95 NB
|
|
Wick Drain Installation, South of I-95 NB
|
Driving Pipe Piles for Work Trestle
03/04/2014
Looking East, South side of existing I-95 Northbound
|
|
Crew installing settlement monitiring devices on existing bridge piers
|
Tree clearing, I-95 Northbound Embankment, West of Compost Road
01/30/2014
Laydown Area / Cranes
Compost Rd (West Haven)
New Haven Side: Looking West at Exit 44 Kimberly Ave off Ramp
|